ITERCON builds third phase of Delin Property’s logistics park in Illescas

  • The design and construction company has carried out the previous stage developments.
  • The project, which has been designed using BIM methodology, will aim for the highest sustainability certificate, BREEAM Outstanding.

The company specialized in design and construction, ITERCON, has started a new project together with Delin Property, a leading company in the management of logistics real estate throughout Europe. On this occasion, the British fund has awarded ITERCON the development of the third phase of the complex it’s carrying out in Illescas (Toledo).

ITERCON will build a 21,000-square-meter building on the 111,000-square-meter plot where the park’s three warehouses are located, which has been designed using the Building Information Modeling (BIM) methodology. The use of this way of working, for which the technical office team obtained AENOR certification, makes it possible to centralize all the information of a project digitally,

This allows for greater traceability, reducing obstacles and increasing the efficiency and quality of the result.

The logistics centre will have a main building, which will be used mainly for storage, and an office area, as well as private parking spaces and a shed in which, in the future, a security service will probably be installed.

The building will have a clear height of more than 12 meters, a feature that will allow the future tenant of the building to increase the storage capacity of each square meter of floor space. In addition, the facilities, which have been designed to the highest standards of efficiency and safety, will have 26 loading docks, high-risk fire protection and high-level floor plans, among other features.

Following the methodology of all ITERCON projects, sustainable construction will mark the development of the logistics centre, reducing emissions and energy consumption both during the construction process and in the subsequent years of use of the building. In addition, the building will have its own renewable energy source through a system of solar panels installed on the roof and will promote efficient travel with electric charging stations and regenerative elevators.

Moreover, it will apply for BREEAM certification in its highest category, Outstanding. A level that was achieved in the previous phase, also carried out by ITERCON, and which made it the first logistics warehouse in the country to obtain it.

Trust as a seal of identity

Delin landed in Illescas, one of the most important logistics hubs in the Iberian Peninsula, in 2021 with the objective of developing a logistics complex divided into three phases. For the execution of the first phase, it entrusted ITERCON, among others, with the company’s extensive experience both in the logistics sector and in Illescas, where at the time it had already built several warehouses for major multinationals.

The high level of the finishes, the quality of the equipment and the timely completion of the project made ITERCON the ideal partner for Delin Property, which did not hesitate to award it the second phase in 2022 and now the third phase